Skip to content

Share your feedback for our public consultation here, closing date 25 March.

Proposed Ground Floor Plan

We are planning the following updates to the Ground Floor:

  • A new extension at the rear of the building, including a glass-fronted walkway that will provide easier and more direct access from Reception and the main shared areas. A very similar plan was approved by Spelthorne Borough Council in 2021.
  • A new lift, making it easier for everyone to move between all floors of the building.
  • Improvements to the shared guest spaces, ensuring they are better organised and appropriately sized for guests and staff.
  • Changes to the bedroom layout, so that room types better meet modern hotel standards.

Key

  1. A new single-storey extension at the back of the building.
  2. A glass-fronted walkway
  3. A new lift
  4. Improvements to the main reception and welcome areas

FOH – Front of House
BOH – Back of House

Proposed 1st Floor Plan

We are planning the following updates to the First Floor:

  • Creating additional bedrooms by adding a new floor within part of the existing double-height space that is currently underused.
  • A new lift, providing easy access to all floors in the main building.
  • Changes to the bedroom layout, so the rooms better reflect modern hotel standards and provide a range of room types.

Key

  1. A new internal floor within the existing atrium space
  2. A new flat-roof extension at the rear of the building.
  3. A new lift

BOH – Back of House

Proposed 2nd Floor Plan

We are planning the following updates to the Second Floor:

  • Expansion of the roof of the main building to accommodate additional guest rooms, including extending the rear staircase so it can be used as a second emergency escape route.
  • A new lift, providing easy access to all floors in the building.
  • Improvements to the bedroom layout, so the rooms better meet modern hotel standards and offer a suitable mix of room types.

Key

  1. A new roof extension
  2. An extension to the rear staircase
  3. A new lift